Graco PR-Xv Instructions Manual page 43

Variable ratio metering system
Table of Contents

Advertisement

F
. 52 Manual Main Screen
IG
16. On the Manual Main Screen, select the "Shot"
control mode and then press
materials.
17. Install the ratio check nozzle onto the TC Dispense
Valve (AB, page 8).
F
. 53 Ratio Check Nozzle
IG
18. Dispense into a waste container to prime the ratio
check nozzle.
19. Execute procedure of reload > Pre-charge > shot
dispense by pressing
times until there is no air in the system.
20. Perform Ratio Check Procedure, page 44.
21. Remove the ratio check nozzle and install Static
Mixer Package (AA, page 8) to TC Dispense valve
(AB, page 8).
to purge out
>
>
for several
F
. 54 Install Static Mixer Package
IG
22. Dispense into a waste container to prime the Static
Mixer Package (AA, page 8).
23. Press
to display System Main Screen. Then
press
to display Automatic Main
Screen.
24. On the Automatic Main Screen, select the correct
control mode and get ready for running the system.
Operation
43

Advertisement

Table of Contents
loading

Table of Contents