Unpacking The Device; Installing Options - Enterasys Matrix E1 Series Installation Manual

Hide thumbs Also See for Matrix E1 Series:
Table of Contents

Advertisement

Unpacking the Device

3.2
UNPACKING THE DEVICE
Unpack the device as follows:
1. Open the box and remove the packing material protecting the device.
2. Verify the contents of the carton as listed in
Table 3-1 Contents of Shipping Carton
Item
1G582-09 or 1G587-09
Cable Management Bar and Associated Hardware
Pair of Rack Mounting Brackets and Associated Hardware
Manual Accessory Kit
Power Cord
3. Remove the tape seal on the non-conductive bag to remove the device.
4. Perform a visual inspection of the device for any signs of physical damage. Contact Enterasys
Networks if there are any signs of damage. Refer to
3.3

INSTALLING OPTIONS

NOTE: If you are installing optional Ethernet expansion modules, or GBICs in the
1G58x-09, it is recommended that you install the GBICs in the 1G58x-09 first, especially
in a rackmount installation.
CAUTION: The expansion modules are NOT hot-swappable. The switch must be
powered down before the expansion modules are installed or removed. Hot-swapping
the expansion modules while the 1G58x-09 is powered on could cause the device to
stop forwarding frames.
3-2
Hardware Installation
Table
3-1.
Quantity
1
1
1
1
2
Section 1.4
for details.

Advertisement

Table of Contents
loading

This manual is also suitable for:

1g582-091g587-09

Table of Contents