Figure 3-12 Device, Rear View
➀
AC power cords
➁
AC power receptacles
3. Observe the LANVIEW LEDs. The Power (PWR) LED (not shown), located on the front panel,
turns ON (green) and the CPU turns red until the device completes its initialization. It takes
under 30 seconds for the device to boot up.
NOTE: If the power-up sequence is interrupted on this device, or if optional hardware
has been installed or removed, this device may run an extended diagnostics sequence
that may take up to two minutes to complete.
If the initialization process is successful, the CPU LED turns green. If the CPU LED does not turn
green, refer to
Chapter 4
3.8
CONNECTING TO THE NETWORK
The following procedures cover the cable connections from the network or other devices to the
1G58x-09 or any installed optional GBIC.
•
Connecting UTP Cables
•
Connecting Fiber-Optic Cables to GBICs
➂
for troubleshooting information.
(Section
3.8.1)
Á
À
Â
AC power outlets. Each outlet is on a separate circuit.
(Section
3.8.2)
Connecting to the Network
Hardware Installation
3-19