Flue Terminal Guarding; C33 Concentric Vertical Flue Systems - Lochinvar ECOKNIGHT EKW116CE Installation, Commissioning, Maintenance And User Instructions

Floor standing gas fired condensing circulating type water heater
Table of Contents

Advertisement

When inserting the terminal, ensure the air intake section is at the bottom.
5.
Fill the void between the terminal and wall with water resistant sealant.
6.
Fit the wall plates or rosette using appropriate fixings.
7.
Install the remainder of the flue system working progressively away from the Water Heater supporting the pipes as
necessary.
10.12.1
HORIZONTAL TERMINAL INSTALLATION

FLUE TERMINAL GUARDING

If a horizontal flue terminal is to be fitted less than 2 metres from ground level or in a location where it can be touched from a window,
door or balcony, a terminal guard must be fitted.
C
CONCENTRIC VERTICAL FLUE SYSTEMS
33
Flue system specifications
MANUFACTURER MUELINK AND GROL (M&G)
TEMPERATURE CLASS T120
FLUE GAS MATERIAL PP
Each concentric vertical flue kit includes the items shown in the tables below
CONCENTRIC VERTICAL FLUE ASSEMBLY
COMPONENTS INCLUDED
Item No.
BEND 90° 100mm PP
M85181
BEND 45° 100mm PP
M85182
SAMPLING POINT Ø100/150mm PP
M84421
CONCENTRIC ADAPTER TEE Ø100/100mm Ø100/150mm PP
M75259
AIR INLET TRANSITION Ø100mm ALU
M75257
EXTENSION Ø100mm (500mm) PP CUT TO LENGTH
M85176
CONCENTRIC EXTENSION Ø100/150 (500mm) PP CUT TO LENGTH
M84405
CONCENTRIC VERTICAL TERMINAL Ø100/150mm PP
LV310754
Item No EKWVF002
MODELS EKW116CE
Description
Number
Quantity
1
3
2
1
3
1
4
1
5
1
6
3
7
1
8
1
31

Advertisement

Table of Contents
loading

Table of Contents