Section 1 – Installation

Unpacking the Instrument

Verify all parts listed on the packing slip have arrived with the instrument. If parts are
missing, contact Chandler Engineering immediately.

Lifting Instructions

To position the instrument for installation, a two person lift is recommended. Firmly grasp
the bottom of the instrument frame on opposite sides while lifting to ensure the instrument
stays level. Do not attempt to lift, carry, or move the instrument with only one person.

Utilities Required

208-240VAC, 8A, 50/60HZ
Water supply
Drain

Tools/Equipment Required

Basic hand tools

Setting up the Instrument

Refer to Figure 1 for the following steps:
1. Place the instrument on a sturdy, level table.
2. Close the supply and drain valves.
3. Connect the water supply and drain lines.
4. Connect cooling coils to a cold water source and drain, if so desired. Cooling coil use is
optional. Either connection can be used for the inlet or outlet.
5. Connect power cord to the correct voltage source.
6. Remove the slurry containers.
7. Fill the bath until it is 1/2" (12.5mm) below the brass rotating sleeves by opening up the
water supply valve.
8. Close water supply valve when appropriate water level is obtained.
Note: To prevent shock hazard, connect the instrument to an electrical outlet using a three-
prong socket to provide positive ground.
SECTION 1 – INSTALLATION