Section 1 – Installation
Unpacking the Instrument
Verify all parts listed on the packing slip have arrived with the instrument. If parts are
missing, contact Chandler Engineering immediately.
Lifting Instructions
To position the instrument for installation, a two person lift is recommended. Firmly grasp
the bottom of the instrument frame on opposite sides while lifting to ensure the instrument
stays level. Do not attempt to lift, carry, or move the instrument with only one person.
Utilities Required
208-240VAC, 8A, 50/60HZ
Water supply
Drain
Tools/Equipment Required
Basic hand tools
Setting up the Instrument
Refer to Figure 1 for the following steps:
1. Place the instrument on a sturdy, level table.
2. Close the supply and drain valves.
3. Connect the water supply and drain lines.
4. Connect cooling coils to a cold water source and drain, if so desired. Cooling coil use is
optional. Either connection can be used for the inlet or outlet.
5. Connect power cord to the correct voltage source.
6. Remove the slurry containers.
7. Fill the bath until it is 1/2" (12.5mm) below the brass rotating sleeves by opening up the
water supply valve.
8. Close water supply valve when appropriate water level is obtained.
Note: To prevent shock hazard, connect the instrument to an electrical outlet using a three-
prong socket to provide positive ground.
SECTION 1 – INSTALLATION
1-1