22. Route the Low Cable (53) under a Pulley (48)
and through the Lower Upright (20).
Attach the Pulley (48) inside the Lower Upright
(20) with an M10 x 68mm Bolt (71), two M10
Washers (57), two 13mm Spacers (52), and an
M10 Locknut (56).
23. Route the Low Cable (53) over a Pulley (48).
Attach the Pulley (48) and two Half Guards (43)
to the Double U-bracket (63) with an M10 x
45mm Bolt (81) and an M10 Locknut (56). Make
sure that the Half Guards are on the outside
of the Double U-bracket as shown.
24. Route the Low Cable (53) under a Pulley (48).
Attach the Pulley (48) and two Half Guards (43)
to the Base (1) with an M10 x 45mm Bolt (81)
and an M10 Locknut (56). Make sure that the
Half Guards are on the outside of the bracket
as shown.
22
56
57
52
48
53
23
56
43
53
24
56
43
53
18
20
57
71
52
63
43
81
48
48
43
81
Bracket
1