Submersible Pump Installation; Performance Table - EBARA Oil Smart ESS100 Operating Instructions, Installation & Maintenance Manual

Pump system
Table of Contents

Advertisement

EBARA Oil Smart Pump System

Submersible Pump Installation

General Materials Needed
• One can PVC cement (read instructions carefully)
• One can thread compound (read instructions carefully)
• One male PVC adapter: 1
• Enough rigid PVC pipe and couplings to reach from bottom of sump basin to discharge:
1
1
/
" for
1
/
HP; 1
4
3
• One Check Valve.
Tools Needed for all pump installations:
Pipe wrench, slot screwdriver, 24-tooth hacksaw, knife or round file.
Step 1
– Thread male PVC adaptor into pump discharge opening.
Step 2
– Cement a 15" piece of PVC pipe to adaptor. Use appropriate diameter piping.
Drill a 1/8" relief hole in the pipe 5" above pump connection. This hole prevents pump
from air-locking.
Step 3
– Clamp Check Valve to top of 15" PVC pipe with water flow arrow pointing
away from pump.
Step 4
– Lower pump into basin. Clamp needed PVC discharge pipe and fittings to
open end of Check Valve.
Step 5
– Plug in pump and fill sump basin with water. Pump should turn on at 13" to
14" water level. Perform several ON-OFF cycles to assure satisfactory operation.

Performance Table

TOTAL HEAD
TOTAL HEAD
ITEM NO
Optima-3
1/3 HP
EPD-3
1/3 HP
EPD-5
1/2 HP
EPD-7
3/4 HP
EPD-10
1 HP
EPD-15
1
1
/
HP
2
EBARA Pumps Americas Corporation
www.pumpsebara.com
(t) 803 327-5005 • (f) 803 327-5097
1
/
" for
1
/
4
3
1
/
" for
1
/
,
3
/
, 1 & 1
1
2
2
4
(Capacity in Gallons per Minute)
5
10
15
40
33
25
45
38
31
66
67
HP; 1
1
/
" for
1
/
,
3
/
, 1 & 1
2
2
4
/
horsepower models.
2
20
25
30
14
20
7
49
40
29
63
54
45
74
65
56
85
77
68
1
/
horsepower models.
2
35
40
45
17
35
25
14
46
36
26
58
48
38
50
55
15
26
15
11
rev. 01/14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oil smart essim30Oil smart essimtp3

Table of Contents