Control Board Removal And Installation - kozy heat CHASKA 29 GLASS Installation And Operation Manual

Direct vent gas fireplace insert
Hide thumbs Also See for CHASKA 29 GLASS:
Table of Contents

Advertisement

9.4 Control Board Removal and Installation

WARNING: If burner and/or pilot have been burning, use appropriate
protection to avoid burns or damage to personal property before
removing any components. DO NOT OPERATE THIS APPLIANCE
WITHOUT THE SEALING GASKET (LOCATED UNDER THE CONTROL
BOARD) IN PLACE. IF GASKETING IS DAMAGED, IT MUST BE REPLACED.
CAUTION: Check all connections for leaks with soapy water, whether
field or factory made.
9.4.1 Control Board Removal
1.
Disconnect electrical power.
2.
Locate the manual valve installed by your qualified service
technician.
3.
Turn the manual valve clockwise to the OFF position.
4.
Remove the safety barrier and glass assembly.
5.
Remove glass media and media dam.
6.
Remove burner cover from firebox (8) screws.
7.
Remove burner tube from heat shield (2) screws.
8.
Remove halogen bulbs.
9.
Remove heat shield from firebox.
10. Remove and save (8) screws securing control board.
11. Lift control board out of firebox, being careful not to damage
sealing gasket lying underneath.
9.4.2 Control Board Installation
1.
Place the control board in firebox, aligning the holes in board
with mounting studs at the bottom of the firebox.
VERIFY SEALING GASKET IS IN PLACE ON THE BOTTOM OF THE
FIREBOX.
2.
Secure the control board with screws previously removed.
3.
Reinstall heat shield and halogen bulbs.
4.
Reinstall burner tube, positioning burner venturi over burner
orifice, aligning mounting holes with corresponding holes
in control board assembly. Secure with (2) screws previously
removed.
5.
Reinstall burner cover, aligning holes in cover to corresponding
holes on burner. Secure with (8) screws previously removed.
6.
Reinstall glass media, being careful not to block pilot.
7.
Turn the manual valve counterclockwise to the ON position.
8.
Reconnect electrical power.
9.
Reinstall the glass assembly and safety barrier.
10. Verify proper log placement, operation of fireplace, and any
electrical components.
#CSK-29-G R.9 August 2020
Figure 9.4, Control Board Removal and Installation
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
ON
CONTROL BOARD
BURNER
TUBE
BURNER COVER
OFF
HEAT SHIELD
GAS FIREPLACE INSERT SETUP 29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Csk-29-g

Table of Contents