Dealer Pre-Delivery Checklist - H&S HI-DUMP 9215 Operator's Manual

Table of Contents

Advertisement

DEALER PRE-DELIVERY CHECKLIST

AFTER COMPLETION, DEALER SHOULD REMOVE AND RETAIN FOR RECORDS
After the HI-DUMP has been completely set up, check to be certain it is in correct operating order
before delivering to the customer. The following is a list of points to inspect. Check off each item as
you have made the proper adjustments and found the item operating satisfactorily.
HI-DUMP was not damaged in shipment. Check for dents and loose or missing
parts. Report damage immediately to H&S Manufacturing Co., Inc.
HI-DUMP has been correctly assembled according to the Dealer Set-up
Instructions and/ or the Set-up & Assembly Instructions in this manual.
Wheel nuts are torqued to listed specification and all other fasteners are
tightly secured.
All bolts and fasteners are tight.
All shields and guards are in place and fastened.
All grease fittings have been lubricated.
Hoses and fittings are properly attached and there are no visible leaks.
All cylinder/mechanisms are operating trouble free.
Decals are in place and legible.
For proper weight ballast, a tractor weight kit & weights, or solution in excess of
1,600 lbs has been added to the tire opposite the dump side.
Model Number ______________________________________________
Serial Number ______________________________________________
Dealer's Name _________________________________________________________________
Inspection Date _____________________________________________
Signature of Pre-Delivery Inspector _________________________________________________

Advertisement

Table of Contents
loading

This manual is also suitable for:

Loadmaster x9215

Table of Contents