2. Secure the server board with nine screws (see letter "B").
3. Place air duct side wall onto the server board (see letter "C").
4. Secure the air duct side wall with the four screws (see letter "D").
5. Connect all power cables to the server board.
Replacing the Backup Battery
The lithium battery on the server board powers the RTC for up to 10 years in the absence of power.
When the battery starts to weaken, it loses voltage, and the server settings stored in CMOS RAM in
the RTC (for example, the date and time) may be wrong. Contact your customer service
representative or dealer for a list of approved devices.
®®
Intel
Server System R1000GZ/GL Service Guide
Figure 67. Installing the Server Board
Figure 68. Installing the Air Duct Side Wall
Hardware Installations and Upgrades
39