Installation, CB-18 Weld-On (part # 10652, 10655, and 10656)
CB-18 Weld-On Post must be installed by an American Welding Society (AWS) certified welder in
accordance with all applicable welding regulations.
Post diameter: 2
7 / 8
"
Welding must
Fillet weld: 5/16"
be done by AWS
certified welder
Minimum beam flange width: 3½"
Maintenance, Cleaning, and Storage
If CB-18 fails inspection in any way, immediately remove it from service, and contact Guardian to inquire
about its return or repair. Field serviceability testing is not required, and should not be done by the end user.
Cleaning after use is important for maintaining the safety and longevity of CB-18. Remove all dirt, corrosives,
and contaminants from CB-18 before and after each use. If CB-18 cannot be cleaned with plain water, use mild
soap and water, then rinse and wipe dry. NEVER clean CB-18 with corrosive substances.
When not in use, store equipment where it will not be affected by heat, light, excessive moisture, chemicals,
or other degrading elements.