2-3 Installing the System

2-3-1 Installing the Flow velocity Sensor

The following figure shows an example of the installation.
One fixation screw (sold separately) is required for one sensor.
A wrench (sold separately) is needed to tighten the fixation screw.
※Provided, however, that this does not apply to the cases where the customer determines the
fixation method of the sensor.
"Flow Velocity Sensor Reference Diagram"

2-3-2 Installing the Relay Amplifier

Install the relay amplifier near the mold. The temperature limit is 55℃. Be careful not to expose
it to temperature higher than this limit.
To fix the amplifier, prepare mechanical means such as DIN rail, etc by the customer.
Be careful not to allow the sensor cable to get caught in the molds or pulled by the movable
mold while it is in operation.

2-3-3 Installing measurement amplifier

Install the amplifier by fixing it on the molding machine or preparing a dedicated placing table.
Operating temperature range is from 0 to 50℃.