Preparation; Setting Up The Network Connections; Installing Pc Software; Hardware Requirements - FUTABA MFS02 Instruction Manual

Melt front speed measuring amplifier
Table of Contents

Advertisement

2.Preparation
This section explains the preparation required before turning on the power.

2-1 Setting up the Network Connections

■ Make settings for communication between the amplifier MFS02 and PC.
* For the Network setting procedure, refer to the "Measurement Software (PFS)
Installation Manual".

2-2 Installing PC Software

2-2-1 Hardware Requirements

■ Supported OS
The operations of this software have been verified with the following operation systems.
Windows XP, Windows 7, Windows 8
■ Capability
The following specifications are recommended.
CPU: Core2Duo or higher
Memory: 1GB or more
*As a rough guide, the PC should have been released in 2007 or later and have 1GB or more memory.

2-2-2 Installation

*For the installation procedure, refer to the "Measurement Software (PFS) Installation
Manual".

2-2-3 Checking the version

The version of the software currently used can be checked.
*Unless there is particular reason, always use the latest software for operation.
From the main menu, select [Help] →[About PFS].
PC software version on the upper row
Amplifier software version on the lower
row
5

Advertisement

Table of Contents
loading

Table of Contents