6. SET UP AND PREPARATION FOR
OPERATION
1. Bolt the Support Leg to the Log Splitter, lift the log splitter by the handles at both ends and place it on a 60 –
75cm high, stable, flat and level work surface.
2. Familiarize yourself with the controls and features of this log splitter in the illustrations.
1. Log Pusher
2. Work Table
3. Wedge
4. Lift Handle
5. Support Leg
6. Log Retaining Plates
7. Switch
8. Motor
9. Pushbutton Box
10. Wheels for Minor Moving ONLY.
11. Hydraulic Control Lever
12. Control Lever Guard
13. Bleed Screw
14. Oil Drain Bolt w/ Dipstick
15. Max Pressure Limiting Screw
Before operating the log splitter, the Bleed Screw should be loosened by some rotations
until air can go in and out of the oil tank smoothly.
Air flow thru the Bleed Screw hole should be detectable during the log splitter is under
operations.
Before moving the log splitter, make sure the Bleed Screw is tightened to avoid oil leak-
ing from this point.
FAILED TO LOOSEN THE BLEED SCREW WILL KEEP THE SEALED AIR IN HY-
DRAULIC SYSTEM BEING COMPRESSED AFTER BEING DECOMPRESSED.
SUCH CONTINUOUS AIR COMPRESSION AND DECOMPRESSION WILL
BLOW OUT THE SEALS OF THE HYDRAULIC SYSTEM AND CAUSE PERMANT
DAMAGE TO THE LOG SPLITTER.