Mounting and assembly
6.2 Installation check list
6.2

Installation check list

Note
Required checks
The checklists below do not purport to be complete. It may be necessary to perform additional
checks and tests in accordance with the situation specific to the particular installation site.
Assemble the servo geared motor as described in the following chapters of the operating
instructions.
Thoroughly familiarize yourself with the safety instructions and observe the checklists below
before starting any work.
Table 6-1
Are all of the necessary components of the configured drive line-up available, correctly
dimensioned, installed and connected?
Are the environmental conditions in the permissible range?
Table 6-2
Is the servo geared motor free of visible damage?
Have the mounting surfaces (e.g. flange, shaft) on the customer machine and on the
servo geared motor been cleaned?
Are the mounting surfaces free of corrosion?
Do the mounting dimensions (e.g. shaft diameter, shaft length, true run) on the customer
machine meet the specification?
Is the supplied mounting paste available for mounting the 1FG1 with hollow shaft or with
splined shaft?
Is the point of power transmission between the customer's hollow shaft and the geared
hollow shaft free of grease, mounting paste and other contamination when mounting
the 1FG1 with shrink disks or SIMOLOC connection? (See chapter Mounting or removing
the hollow shaft with shrink disk (Page 108) or Installing or removing the SIMOLOC
connection (Page 112))
94
Checklist (1) - general checks
Checklist (2) - checks regarding the mechanical system