OPERATION
Operating the Service Crane (continued)
Make sure everyone is in the clear before lifting or lower-
ing a load with the crane. Never swing or position a load
over personnel.
DO NOT exceed the maximum permissible lifting load of
1000 kg.
Be sure to secure the crane in rest position by lowering
the lift boom (4), illustration (Z 22979) onto support (8)
and fastening load hook (7) to eye (9).
For more information of correct crane operation and maintenance
refer to the separate Instruction Manual "CRANE TYPE HMK 60
Ta1". The Crane Instruction Manual is filed in volume 2 Binder.
WARNING
3.19 SERVICE CRANE
281