Komatsu PC5500-6 Operation & Maintenance Manual page 257

Hydraulic mining shovel
Hide thumbs Also See for PC5500-6:
Table of Contents

Advertisement

OPERATION
SWING CIRCLE LUBRICATION SYSTEM "SLS"
Repairs on the swing circle lubrication system with the
Engine running or with the Engine OFF and Main Switch Key
in ON position
If repairs under the above conditions have been carried out it is
necessary to reset the control circuit of the lubrication system by
actuating the rotary switch (2), illust. (Z 21762) for a full lube
cycle.
If this manually actuated lube cycle is not being carried out, the
fault message "LUBE SYSTEM FAILURE" will remain on the ECS
display (3).
Resetting of the lube system control circuit can also be done by
shutting down the engine and switching OFF the main switch key.
NOTICE
For more information regarding inspection, trouble shooting
and maintenance of the lubrication system, refer to the sepa-
rate manual LUBRICATION SYSTEMS in volume 2 binder.
ADJUSTMENTS OF THE SWING CIRCLE-
LUBRICATION SYSTEM
The following adjustments can be made in the service menu of
the ECS system:
Level 4: Service Menu / Settings
*PAUSE TIME
*MONITORING TIME
*PRESSURE RELIEF TIME
*LUBE CYCLE COUNTER
Refer to section "ELECTRONIC MONITORING AND CONTROL
SYSTEM ECS" for description of adjustment procedure.
3.16 OPERATION OF THE LUBRICATION SYSTEM
257

Advertisement

Table of Contents
loading

This manual is also suitable for:

15027

Table of Contents