Komatsu PC5500-6 Operation & Maintenance Manual page 227

Hydraulic mining shovel
Hide thumbs Also See for PC5500-6:
Table of Contents

Advertisement

OPERATION
Emergency By-pass Switch for the ECS- Shut-down Func-
tion.
The unit is equipped with an Emergency By-pass Switch for the
ECS-system.
This switch is located on the "X2" switch board in the cab base
compartment and marked with "S27".
If an automatic shut-down of the Shovel happens, with a danger-
ous situation for man or machine, which needs the Shovel to be
operable to overcome the dangerous situation, actuate this switch
to override the shut-down function of the system and to enable a
restart of the engines.
As soon as the immediate situation of danger is over, shut
down the unit. Correct the fault that caused the shut down
and re-set the Emergency By-pass switch.
REMARK
When a battery voltage fault has occurred, the operational
data (oil vicosities, timer settings etc.) stored in the Programma-
ble Logic Controller (PLC) can be lost and must be re-entered
after the correct battery voltage has been re-established.
Engine warm-up
After starting let the engines run for a warm-up period before
increasing the engine speed. This is necessary to avoid piston
and bearing seizure.
Refer to the engine operation and maintenance manual for the
most favourable coolant temperature.
Hydraulic oil warm-up
On machines without hydraulic oil pre-heating system:
DO NOT start the engines if the ambient temperature (oil tem-
perature) is below the starting temperature shown in column
"1" of the hydraulic oil viscosity chart on page page 230 in this
section.
On machines with hydraulic oil pre-heating system:
Before starting the engine, warm-up the hydraulic oil to the
starting temperature shown in column "1" of the hydraulic oil
viscosity chart.
CAUTION
3.9 STARTING THE ENGINES
227

Advertisement

Table of Contents
loading

This manual is also suitable for:

15027

Table of Contents