OPERATION
Time Diagram of Statistics Print
The diagram below shows an example, how the time without
faults (Good) and the time with faults (Err) could be distributed
within the total operating time of the ECS.
E: Total operating time of the ECS
524/578/590/608: Total time of a message
Err: Total time of all messages
Good: Total time without messages
Message Number:
524
578
590
608
Good
Good (02:00:00 = 33.3%)
524 (01:00:00 0 25.0%)
578 (01:00:00 0 25.0%)
590 (02:30:00 0 62.5%)
1
2
3
Error
3.4 ELECTRONIC MONITORING AND CONTROL SYSTEM ECS
E
608 (01:00:00 = 25.0%)
5
4
Good
Err (04:00:00 0 66.6%)
6
time
121