Spectralink DECT Server 2500 Installation Guide
Chapter 1: Spectralink DECT Server 2500
Installation
This guide describes how you install the Spectralink DECT Server 2500.
Installing the Spectralink DECT Server 2500
The Spectralink DECT Server 2500 can be installed on a flat surface or on a wall. Before you start
the installation, place the Spectralink DECT Server 2500 on a stable flat surface in the selected
location, and inspect the package for any damage and report it to the reseller or distributor
immediately.
Important
Please review all the safety instructions for important safety and regulatory
information
Specifications
Table 1
Physical Dimensions
Physical dimensions
Height
Width
Depth
Weight
Table 2
Power Supply
Power supply
AC Input
Table 3
Power Consumption
Power consumption
Typical AC Power Consumption
Max. AC Power Consumption
14205700 Version 9.0
June, 2015
177mm
194 mm
328 mm
1.16 kg (excl. power supply)
100-240 VAC, 50/60 Hz
45 Watt
Max 60 Watt
3
Need help?
Do you have a question about the DECT Server 2500 and is the answer not in the manual?
Questions and answers