USC LPX300 Operator's Manual page 163

Seed treater
Table of Contents

Advertisement

12. Connect any conveyors into the seed treater control
panel. Ensure that the conveyors being used are
the same power ratings as the seed treater.
The starters and overloads located
in the seed treater panel are rated
NOTICE
for 5 HP motors. Do
conveyor into the seed treater that
exceeds 5 HP.
13. Have a certified electrician provide power to the
seed treating system. Provide convenient shutdown
switches, comply with local electrical codes and ensure
that the system is properly grounded and bonded.
The USC system must be connected to the same
electrical requirements as specified in the main control
panel on the power requirement tag (right), or the
electrical schematic shipped with the piece of
equipment. This will power the USC system
including conveyors.
Control panel bracket is hinged to allow
NOTICE
access to the atomizer chamber.
Flexible conduit is recommended for
main power supply.
14. Reverse the previous steps when
removing the machine from its
working position.
Incoming Power Connected To
These Terminals
LPH800 TREATER
TREATER SET - UP
NOT
plug any
Page 15

Advertisement

Chapters

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Lpx2000

Table of Contents