baltur TBL 1200 ME Instruction Manual For Installation, Use And Maintenance page 48

Electronic modulation light oil burners
Table of Contents

Advertisement

Available languages

Available languages

ENGLISH
HYDRAULIC BLOCK DIAGRAM OF SINGLE BURNER SUPPLY SYSTEM WITH RING-TYPE CIRCUIT TO BE MADE BY
INSTALLER
5
4
HYDRAULIC DRAWING OF SUPPLY FOR ONE OR MORE TWO-STAGE OR MODULATING BURNERS WITH MAXIMUM
NOMINAL VISCOSITY (5°E AT 50°C)
1
1
Main tank
2
Liquid fuel filter
3
Circulation pump
4
Water and system drain
5
Fuel recovery and degasifier
6
One-way valve
7
By-pass (normally closed)
A
Connection to the burner
2
1
2
1
8
5
7
4
6
6
0006160448_202302
3
8
8
5
7
6
4
2
The fuel recovery tanks (diameter ~ 150 mm - height ~
400 mm) must be installed as close as possible to the
burner at 0.5 m above the burner pump.
12 / 34
1
Light oil filter
2
Circulation pump (one spa-
re)
3
Burner pumping unit
4
Main tank
5
Possible Vapour or hot wa-
ter heating coil for fuel heating
5
7
4
3

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

36290010

Table of Contents