Annual Maintenance - Huawei UPS5000-E-30 kVA User Manual

Integrated ups
Table of Contents

Advertisement

UPS5000-E-(30 kVA–180 kVA)
User Manual (Integrated UPS)

6.2.4 Annual Maintenance

Table 6-6 Annual maintenance
Check Item
Capacity test
Battery
connection
reliability
Issue 02 (2022-12-30)
Expected Result
When the UPS is backed up,
discharge a battery to the
undervoltage alarm threshold
to refresh the capacity of the
battery.
1. When battery strings are
powered off, check the
reliability of each
connection point from
positive terminals to
negative terminals. All
points are connected
reliably.
2. Use a torque wrench to
check the tightening
torque for each battery
screw. The torque meets
the requirements of the
battery manufacturer.
After checking that the
battery screws meet the
requirements, mark the
screws for later check.
Copyright © Huawei Digital Power Technologies Co., Ltd.
6 Routine Maintenance
Troubleshooting
1. Locate the fault cause.
2. If the fault persists, contact
technical support.
1. Rectify any abnormal
connection.
2. If the fault persists, contact
technical support.
152

Advertisement

Table of Contents
loading

Table of Contents