Mitsubishi Heavy Industries SRK100VNXWZRF Service Manual page 54

Inverter packaged air-conditioners
Table of Contents

Advertisement

Control PCB
Remove harnesses from bands.
And, remove the harnesses which are
bundled by these bands from clips and
connectors on the control PCB.
Fig.3 Target places which are removed harnesses and screws
Harness
Procedure on tightening harness (Snubber capacitor) and power transistor with screw.
A metallic connection binder is set in each hole of the inverter PCB of "P", "N", "U", "V", and "W" beforehand.
Then tighten the harness (Snubber capacitor) and the power transistor with the screw together.
(Set the harness wires to be fixed to "U" and "W" with screws in respective holes after passing them through IC21 and 22.)
(Connect the snubber capacitor with "P" and "N".)
※:Presence and shape of electric
component may vary according
to a model.
Remove screws.
(4 places)
Terminal
Inverter PCB
Connection binder (Metallic pillar)
Power transistor
Fig.5 Installation method to power transistor
53
-
Fig.4 Installation place of inverter PCB
Snubber capacitor
-
'22 • PAC-SM-422
(C) Voltage measurement point
of power source for inverter
: DM (+) – DM (–)
Inverter PCB
Snubber capacitor

Advertisement

Table of Contents
loading

Table of Contents