Delta Foul V3 Installation And Operating Manual page 25

Submersible pump
Hide thumbs Also See for Foul V3:
Table of Contents

Advertisement

CAUTION
5.3.1.5 Fitting the guide rail
1. Position rail 710 into the recess of pedestal 72.1. Place the rail in a
vertical position.
2. Mark the length of rail 710 (up to the lower edge of the mounting
bracket), taking into account the adjusting range of the slotted holes
in mounting bracket 894.
3. Shorten rail 710 with a 90° cut to the pipe axis. Debur the rail inside
and outside.
4. Insert mounting bracket 894 into guide rail 710 until the mounting
bracket rests on the rail end.
5.3.1.6 Preparing the pump set
Fastening the claw for single guide rail arrangement.
1. Fasten claw 723 with screw 914.05 and disc 550.35 to the discharge
flange (see drawing). Tighten the screw to a torque of 17 Nm.
5.3.1.7 Attaching the lifting chain / rope for pedestal mounted
(stationary) wet installation.
1. Attach the lifting chain or rope to the lug/eyebolt/bail at the
pump set on the opposite side of the discharge nozzle.
This attachment point achieves a forward inclination of the
pump set towards the discharge nozzle, which allows the pump
claw to hook onto the pedestal..
Delta Foul V3 Submersible Pump
Improper installation of the guide rails
Damage to the guide rail arrangement!
 Always adjust the guide rails so that they are in a perfectly vertical position.
5 Installation at site
Figure 8. Fitting the guide rail
Figure 9. Fastening the claw
Figure 10. Attaching the lifting
chain for pedestal mounted
(stationery) wet installations
Installation and operating manual
894
710
60.3
33.7
25 of 56

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dms 120Dms e029

Table of Contents