Scaleo medical Poweo 200 User Manual page 31

Patient lifters
Table of Contents

Advertisement

3. Place the legs section over and down between the thighs. Pull
outwards from the inner part of the thighs.
4. Attach the 4 loops to the 4 points of the suspension, in the same way
as with the other slings.
5. Set the lifter close to the toilet and lower the patient gently. The
sling may be used during the entire operation, since the legs sections
of the toilet sling are developed to separate the legs.
The inside legs section of the toilet slings is made so that the legs of the patient can be spread,
they must not be crossed in the same way as the other slings.
Complementary information on the use of the electric tilting suspension of the Poweo® 200
The tilting suspension uses mobile parts. However, because the moving parts move very slowly the risk
of pinching fingers or any human part is very low: moving parts require keeping the remote control
button pressed. Releasing the button will be enough to stop the movement.
Moreover, if the patient keeps the arms along the body, there is no risk at all of pinching.
We recommend is to monitor the patient during the transfer to ensure that the security advices are
taken into consideration.
Potential pinching zone
Use of the Poweo® 200 with a stretcher
DOMU102_EN_8_20221201_ Poweo® 215-200 user manual
Potential pinching zone
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Poweo 215S16030S16035S16040S16020S16022 ... Show all

Table of Contents