First Time Installation Checklist; Flow Chart For Ccm-270A/Ws Touch Screen Centralized Controller - Midea CCM-270A/WS Service Manual

Touch screen centralized controller 10.1-inch
Table of Contents

Advertisement

CCM-270A/WS

2 First Time Installation Checklist

2.1 Flow Chart for CCM-270A/WS Touch Screen Centralized Controller

Below is a flow chart of the check points that need to be kept in mind while installing the CCM-270A/WS centralized
controller for first time.
Process
Connect the IDU and ODU
with each other
Connect the power cable
to CCM-270A/WS
Auto Addressing & ENC4
Settings
Provide the power
Login the CCM-270A/WS
Install the IDUs
Check Results
Set Normal user account
Connect the Power Meter
1
The ENC4 settings are required to distinguish several ODUs from different system from each other, this setting is specially required when high end device like IMMPRO are being used.
44
Check Point
Refer to the IDU and ODU respective installation manuals
The power cable is not supplied with the CCM-270A/WS. The
user needs to purchase a power adaptor of 24VAC, current
The ODU needs to be set to auto addressing
It will take atleast one minute to reach the user login
interface from the boot screen
The first login needs to be from administrator account,
Username: admin
Password: 1
Details discussed in 1.11 Login
Details discussed in 1.12 Install the IDUs
An account with lesser permissions for the End User
Details discussed in 1.13 Checking the Installation Results
If the ECS function is required to be used, connect the power
meter. Details discussed in 1.15 Energy Meter Installation
1000mA
1
201807