CCM-270A/WS

1.3 Flow Chart

Before we discuss in detail about the various steps that need to be followed for successful installation and commissioning
of CCM-270A/WS device, below is listed a flow chart of all the events that need to be followed. In this flow chart, is given a
sequence of actions that need to be followed to successfully finish the installation and commissioning of the
CCM-270A/WS gateway device both for touch screen and computer website.
1.3.1 For Touch Screen only
The following flow chart describes the installation steps while only the CCM-270A/WS is required to be used as a
centralized controller.
Connections between ODU &IDU
1
Power cable connection
Set the ODU to auto addressing mode and complete the
ENC4 switch settings
Login administrator account & install the indoor units
Set the normal user account
3
Install the energy meter and activate the ECS function
if the
ECS function is required to be used
Note: 1 The power cable is not provided as a standard accessory within the box. The user needs to buy the power cable from the market himself.
2 The LAN cable is also not an accessory in the box. The user needs to purchase it himself.
3. Refer to Functions Part 9.9ECS Settings for activation.