Commissioning
4 Commissioning
CAUTION : HOT SURFACES, DO NOT TOUCH!
- This warning indicates be careful of hot surfaces when operating the product.
- Do not perform any task until the product cool down sufficiently.

4.1 Display Introduction

RPI M80 series include a 4x20 character type LCD display and 2 LED lights
( located on the left-hand side of the LCD ) to indicate inverter's status as shown
in Figure 4-1. Please refer to Table 4-1 for more information about inverter's
statuses and LED indicator.
The following section will introduce the functions that can be adjusted by users
through the LCD panel. When you are adjusting settings, LCD panel will change
the display cursor from "►" to "
Power Meter
Energy Log
Event Log
Inverter Information
General Settings
Install Settings
Active/Reactive Power
FRT
" .
4.2.2
4.2.3
4.2.4
4.2.5
4.2.6
4.2.7
4.2.8
4.2.9
36

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rpi m80u 120Rpi m80u 121Rpi m80a 120

Table of Contents