4 Commissioning
CAUTION : HOT SURFACES, DO NOT TOUCH!
- Use care to avoid hot surfaces when operating the product!
- Do not perform any task until the unit cools down or appropriate personal
protection gear is worn.

4.1 Display Operation Introduction

M100_210 / 212 with 3 LEDs allow visual display of the inverter's data and status
as shown in Figure 4-1.
Please refer to Table 4-1 for information as to the information provided by the
LED indicators.
Condition
Countdown
On Grid
Inverter Fault / Remote off
Inverter Warning
Field Fault
Field Warning
NO DC
FW Upgrade
Standby
Check PV Power
System Lock
*FLASH: ON 1s / OFF 1s
FLASH FAST: ON 0.25s / OFF 0.25s
FLASH SLOW: ON 5s / OFF 10s
Figure 4-1: Front Panel Display
Table 4-1: Inverter status
Grid (Green)
FLASH
ON
OFF
ON (or OFF)
OFF
ON
OFF
FLASH
FLASH
FLASH FAST
OFF
47
LED Indicator
LED Indicator
(GRN)
(RED/YEL)
Commissioning
LED Indicator
(GRN)
Alarm (Red/Yellow)
OFF / OFF
OFF / OFF
ON / OFF
FLASH / OFF
OFF / ON
OFF / FLASH
OFF / FLASH SLOW
FLASH / OFF
OFF / FLASH
OFF / FLASH FAST
FLASH / FLASH