Installing The Power Supply Module(S) - Enterasys Matrix N3 7C103 Hardware Installation Manual

Table of Contents

Advertisement

d. Secure the power supply to the chassis by using a screwdriver to tighten the two slotted
screws on the front panel of the power supply. For proper chassis grounding, the screws
must be properly tightened.
5. If you are installing a second power supply, pull open the two latches on the blank plate over slot
PS2 until the plate is released. Remove the blank plate from the second power supply slot (keep
the blank plate in the event you need to remove the power supply), and repeat steps 1– 4.
Figure 3-4 Installing the Power Supply Module(s)
7C203-1
PWR
REDUNDANCY
Å
1 7C203-1 power supply
2 Power supply handle
NOTE: To install the modules, refer to the module installation guide for the installation
instructions. Before you power up the chassis, it is recommended that you complete the
installation of the modules in the chassis.
FAN
STATUS
7C203-1
PWR
REDUNDANCY
Á
3 Module metal guide
4 Chassis metal guide
Ä
100-125V~12.0A
200-240V~6.0A
50/60 Hz
À
Å
5 7C103 chassis
6 Captive screws
Setting Up the Chassis
100-125V~12.0A
200-240V~6.0A
50/60 Hz
Â
Ã
Chassis Setup
3-7

Advertisement

Table of Contents
loading

Table of Contents