This chapter contains instructions on setting up the N3 chassis.
Equipment needed:
•
Phillips screwdriver
•
Flat blade screwdriver
Electrical Hazard: Only qualified personnel should install or service this unit.
Riesgo Eléctrico: Nada mas personal capacitado debe de instalar o darle servicio a esta unida.
Elektrischer Gefahrenhinweis: Installationen oder Servicearbeiten sollten nur durch
ausgebildetes und qualifiziertes Personal vorgenommen werden.
A Phillips screwdriver is needed to install the chassis in a 48.26-centimeter (19-inch) equipment
rack. A large flat blade screwdriver is needed to secure the power supplies and to remove and
reinstall the fan assembly. Refer to
chassis.
3.1
UNPACKING THE CHASSIS
NOTE: Unpack the N3 chassis components only as needed. Leave the components in their
respective shipping cartons until you are ready to install that component.
Caution: Observe all Electrostatic Discharge (ESD) precautions when handling sensitive
electronic equipment.
Precaución: Al trabajar con equipos electrónicos sensibles, tome todas las precauciones de
seguridad para evitar descargas de electricidad estática.
To unpack the chassis, proceed as follows:
1. Remove the chassis from the shipping box. (Save the shipping box and materials in the event the
chassis has to be reshipped.)
Chapter 2
for guidelines that must be followed to install the N3
Chassis Setup
Chassis Setup
3
3-1