Setting Up the Chassis

2. Remove the chassis from the protective plastic bag.
3. Examine the chassis carefully and check for damage. If any damage is noted, DO NOT install
the chassis. Contact Enterasys Networks immediately (refer to
4. Remove the accessory package.
5. Remove the package containing the four rubber feet/screw assemblies and six pan head 10-32
screws.
6. Remove the Electrostatic Discharge (ESD) wrist strap package.
7. Remove the Console Cable Kit and set aside. This kit is needed to set up the modules through
Local Management.
3.2
SETTING UP THE CHASSIS
The following sections describe the procedures that must be followed to complete the chassis
installation.
3.2.1

Order of Installation

Once a suitable site has been chosen following installation site guidelines described in
the chassis can be installed as a freestanding or rack-mounted unit.
It is recommended that the chassis installation proceed in the following order:
1. Install the rubber feet (for freestanding installation).
2. Mount the chassis to a 48.26-centimeter (19-inch) rack or other secure location.
3. Attach the Electrostatic Discharge wrist strap.
4. Install the power supply module(s).
3.2.2

Installing the Rubber Feet

If you are installing the N3 chassis as a freestanding device, start with this section to install the
rubber feet. To install the chassis in a rack, rubber feet are not needed. Therefore, start with
Section 3.2.3
to install the chassis in a rack.
NOTE: Before installing the rubber feet, place the chassis on its back on a sturdy flat surface to
access the bottom of the chassis.
3-2
Chassis Setup
(Section
(Section
3.2.4)
(Section
3.2.5)
Section
1.3).
3.2.2)
(Section
Section
2.1,
3.2.3)