The Field Setup Menu - Ziton ZP2-AF2-P Installation Manual

Hide thumbs Also See for ZP2-AF2-P:
Table of Contents

Advertisement

Chapter 3: Configuration and commissioning

The Field setup menu

Use the Field setup menu to set timeout values for zone test and disablement
operations.
Zone test and disablement timeout
Note:
This feature is not compliant with EN 54-2.
Use the Test/Disable t_out menu to set an independent timeout value (in
minutes) for zone test and disablement operations for the local control panel.
When the control panel is in a Maintenance or Installer user level, active zone
test or disablement operations stop when the corresponding timeout value is
reached.
The default test timeout value is 60 minutes. This value must be set to 000 to
disable the timeout and to force the manual cessation of zone test operations. By
default, no disable timeout value is configured.
Zones previously disabled via the Zone configuration menu (at Installer user
level) are not included in the timeout command and no changes are made to
zone status.
To change the configuration:
1. Select Field setup from the Main menu, and then select Zone configuration.
2. Select Test/Disable t_out.
3. Select Test, and then enter the timeout value (in minutes).
The default value is 060, the maximum value is 120.
4. Select Disable, and then enter the timeout value (in minutes).
The default value is 000, the maximum value is 720.
5. Press F4 (Enter), and then press F1 (Back).
6. Press F1 (Save), F3 (Apply), F4 (Discard), or F2 (Exit).
Remember to apply saved settings from the Main menu.
52
ZP2-A Series Installation Manual

Advertisement

Table of Contents
loading

Table of Contents