S9610-36D is designed to support 1 + 1 power redundancy.
2. Attach the power cable.
Locate the AC inlet connector on the PSU and plug the AC power cable (250VAC 15A, IEC60320
C19) into the AC inlet connector.
3. Feed AC power into the system.
The PSU will immediately output 12.3V & 12VSB to the system with a 200-240V, AC power
source. The PSU has a built-in 25 amperes, fast acting fuse based on the PSU maximum
capacity, which will act as a second tier system protection in case the power distribution unit's
fuse is not functioning.
4. Verify that the power supply is operating.
If connected correctly, when turned on, the LED on the PSU will light up with a solid Green
color designating normal operation.
S9610-36D Hardware Installation Guide | 21

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S9610-36D and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents