The S9511-20CT is designed for the future, featuring 20 high-speed interfaces, including configurable 1G combo ports and 10G/25G options, to support a wide range of client connections.
19 inch (48.3cm) wide racks and the rack mount brackets can be installed at the front or in the center of the S9511-20CT. The depth of the S9511-20CT chassis is 9.84 inches (25.0cm). The connectors for the power supplies will extend outwards by 0.48 inches (1.2 cm).
Power voltage and electric current requirement DC version: -36 to -72VDC, 8A maximum Installation spacing requirement S9511-20CT spacing requires a height of 1RU (1.75”/4.5cm), a width of 19” (48.3cm) in width, and a depth of 16.84 inches (42.77mm) Thermal requirement S9511-20CT working temperature is -40 to 70°C (-40°F to 158°F),...
0.23lb (105g) Screw kit for ground lug 0.008lb (3.5g) Screw kit for rack mount bracket 0.02lb (7g) Dimension S9511-20CT (W x D x H) 17.32” x 9.84” x 1.71” (440 x 250 x 43.5mm) S9511-20CT Hardware Installation Guide | 6...
4 Identifying Your System S9511-20CT Overview Figure 5. DC Version PSU Overview Dual-feed one power stage fixed PSU. S9511-20CT Hardware Installation Guide | 7...
Illustrations are for reference purposes only. Actual scenario may differ. Screws for rack posts not included. Figure 10. For rack post widths wider than 19”, different brackets are available upon request (See Figure below). Figure 11. S9511-20CT Hardware Installation Guide | 9...
3. Insert the exposed grounding wire all the way into the hole of the grounding lug (provided with package contents). 4. Using a crimping tool, firmly secure the grounding wire to the grounding lug. Figure 12. S9511-20CT Hardware Installation Guide | 10...
Page 13
6. Using 2 M4 screws and 4 washers (provided with the package contents), firmly lock the grounding lug to either of the designated grounding locations on the router. Figure 13. Figure 14. Figure 15. S9511-20CT Hardware Installation Guide | 11...
If the torque is too much, the terminal block or lug may be damaged. Figure 17 4. Feed DC power into the system. The PSU will immediately output 12V and 5VSB to the system when a -36V to -72V DC power S9511-20CT Hardware Installation Guide | 12...
Page 15
5. Verify that the power supply is operating. If connected correctly, when turned on, the LED on the PSU will light up with a Green color designating normal operation. S9511-20CT Hardware Installation Guide | 13...
Blinking Yellow **Note: need NOS to activate this feature STAT System (X86) is initializing or not powered System boots complete Solid Green **Note: need NOS to activate this feature Blinking Green System is booting S9511-20CT Hardware Installation Guide | 14...
Management port LED LED Condition Equipment Status Left LED 1G no link Solid Green 1G link-up Blinking Green 1G TX/RX activity Right LED No activity Solid Amber 10M/100M link-up Blinking Amber 10M/100M TX/RX activity S9511-20CT Hardware Installation Guide | 15...
After the connection is established, a prompt for the username and password displays. Enter the username and password to access the CLI. The username and password should be provided by the Network Operating System (NOS) vendor. S9511-20CT Hardware Installation Guide | 16...
1. Connect one end of a straight-through Ethernet cable to the GNSS unit 2. Connect the other end of the straight-through Ethernet cable to the port marked “TOD” located on the front panel of the router. Figure 21. S9511-20CT Hardware Installation Guide | 17...
3. Below is the pinout for the BITS port. Figure 23. Connecting the GNSS Interface Connect an external GNSS antenna with an impedance of 50 ohms to the port marked “GNSS ANT” located on the front panel of the router. S9511-20CT Hardware Installation Guide | 18...
Connecting the 10MHz Interface The maximum length of the 10MHz coaxial SMB cable should not be more than 3 meters. Connect an external 10MHz cable with an impedance of 50 ohms to the port labelled "10MHz”. S9511-20CT Hardware Installation Guide | 19...
3. Place the bail (wire handle) in the unlocked position and align the transceiver with the port. 4. Slide the transceiver into the port and use gentle pressure to secure it in place. An audible click can be heard when the transceiver is secured in the port. S9511-20CT Hardware Installation Guide | 20...
Read the following guidelines before installing an active antenna: • When an active antenna is installed, the S9511-20CT can supply up to 5V DC/150mA on the GNSS port. • If any GNSS amplifier, DC-blocked or cascaded splitter is inserted, the GNSS detection function might be affected, resulting in GNSS satellite clock errors.
The equipment and its modules should only be repaired, maintained or replaced by skilled personnel. Instructed person is a term applied to persons who have been instructed and trained by a skilled person, or who is supervised by a skilled person. <電源コードセットに関する使用上の注意事項> 付属の「AC電源コードセット」は、本製品専用のものです。他の電気機器には絶 対に使用しないでください。 S9511-20CT Hardware Installation Guide | 23...
Page 26
VCCI Notice This is Class A equipment. Operation of this equipment in a residential environment could cause radio interference. In such a case, the user may be required to take corrective actions. S9511-20CT Hardware Installation Guide | 24...
Need help?
Do you have a question about the S9511-20CT and is the answer not in the manual?
Questions and answers