Fan FRU LED ......................... 19 Management port LED ......................19 11 Initial System Setup ......................20 12 Cable Connections ......................21 Connecting the USB Extender Cable ................... 21 Connecting a Cable to the ToD Interface ................21 S9501-28SMT Hardware Installation Guide | i...
Page 3
Connecting a Cable to the BITS Interface ................22 Connecting the GNSS Interface ................... 22 Connecting the 1PPS Interface .................... 23 Connecting the 10MHz Interface ..................23 Connecting the Transceiver ....................24 13 Cautions and Regulatory Compliance Statements .............. 25 S9501-28SMT Hardware Installation Guide | ii...
1 Overview The UfiSpace S9501-28SMT is a high-performance, versatile open networking white box router that is designed to address the changing needs of backhaul transport requirements as Telecoms make the transition from legacy technologies towards 5G. It enables telecoms and service providers to deploy disaggregated open network infrastructure to lower costs and rapidly scale existing services for edge computing, mobile backhaul, and broadband access applications.
200 watts on each power circuit. • Space Clearance: The S9501-28SMT width is 17.32 inches (44cm) and shipped with a rack mount brackets suitable for 19 inch (48.3cm) wide racks and adjustable mounting rails are provided for rack depths of 22 inches (55.9cm) to 33 inches (83.8cm).
• Cooling: The S9501-28SMT airflow direction is front-to-back. Make sure the equipment on the same rack have the same airflow direction. Figure 3. Figure 4. Preparation Check List Task Check Date Power voltage and electric current requirement DC version: -36 to -75V DC, 8A maximum x2 or;...
0.008lb (3.5g) Screw kit for rack mount bracket 0.02lb (7g) and adjustable mounting rail S9501-28SMT (W x D x H) 17.32” x 11.89” x 1.71” (440 x 302 x 43.5mm) Dimension PSU (W x D x H) 1.99” x 8.31” x 1.58” (50.5 x 211 x 40.2mm) Fan (W x D x H) 2.03”...
Power supply unit (PSU) with 1+1 redundancy. Hot swappable, field replaceable unit (FRU). Figure 6. AC Version PSU Overview Power supply unit (PSU) with 1+1 redundancy. Hot swappable, field replaceable unit (FRU). Figure 7. S9501-28SMT Hardware Installation Guide | 8...
M4.0*L6.5mm screws provided in the package. Then secure the adjustable mounting rail to the rack posts. (See Figure 12). Illustrations are for reference purposes only. Actual scenario may differ. Screws for rack posts not included. Figure 11. Figure 12. S9501-28SMT Hardware Installation Guide | 10...
4. Carefully slide the new fan module into the fan bay and gently push until it is flush with the case. 5. Secure the captive screw on the fan module to lock the fan in place. Figure 15. S9501-28SMT Hardware Installation Guide | 11...
1. Locate the release tab on the PSU. Then press and hold down the release tab to unlock the PSU from the power bay. 2. While holding down the release tab, grip the PSU's handle and firmly pull it out of the power bay. DC Version: AC Version: Figure 17. S9501-28SMT Hardware Installation Guide | 12...
Page 16
5. An audible click will be heard when the PSU is installed correctly. The PSU will not go in all the way if it is in the wrong direction. Illustrations are for reference purposes only. Actual scenario may differ. DC Version: AC Version: Figure 18. S9501-28SMT Hardware Installation Guide | 13...
3. Insert the exposed grounding wire all the way into the hole of the grounding lug (provided with package contents). 4. Using a crimping tool, firmly secure the grounding wire to the grounding lug. Figure 19. S9501-28SMT Hardware Installation Guide | 14...
Page 18
6. Using 2 M4 screws and 4 washers (provided with the package contents), firmly lock the grounding lug to either of the designated grounding locations on the router. Figure 20. Figure 21. Figure 22. S9501-28SMT Hardware Installation Guide | 15...
Also, please ensure that both PSUs have been properly installed before powering up the equipment, as the S9501-28SMT is designed to support 1 + 1 power redundancy. 2. Attach the power cable.
It is recommended to ensure that enough power is reserved from the power distribution system before installation. Also, please ensure that both PSUs have been properly installed before powering up the equipment, as the S9501-28SMT is designed to support 1 + 1 power redundancy.
**Note: need NOS to activate this feature STAT System (X86 & BMC) no boot System boot complete (NOS) Solid Green **Note: need NOS to activate this feature Blinking Green System is booting Solid Yellow System boot complete(DIAG OS) S9501-28SMT Hardware Installation Guide | 18...
Management port LED LED Condition Equipment Status Left LED 1G no link Solid Green 1G link-up Blinking Green 1G TX/RX activity Right LED No activity Solid Amber 10M/100M link-up Blinking Amber 10M/100M TX/RX activity S9501-28SMT Hardware Installation Guide | 19...
After the connection is established, a prompt for the username and password displays. Enter the username and password to access the CLI. The username and password should be provided by the Network Operating System (NOS) vendor. S9501-28SMT Hardware Installation Guide | 20...
1. Connect one end of a straight-through Ethernet cable to the GNSS unit 2. Connect the other end of the straight-through Ethernet cable to the port marked “TOD” located on the front panel of the router. Figure 29. S9501-28SMT Hardware Installation Guide | 21...
3. Below is the pinout for the BITS port. Figure 31. Connecting the GNSS Interface Connect an external GNSS antenna with an impedance of 50 ohms to the port marked “GNSS ANT” located on the front panel of the router. S9501-28SMT Hardware Installation Guide | 22...
Connect an external 1PPS cable with an impedance of 50 ohms to the port labelled “ 1PPS”. Figure 33. Connecting the 10MHz Interface Connect an external 10MHz cable with an impedance of 50 ohms to the port labelled "10MHz”. Figure 34. S9501-28SMT Hardware Installation Guide | 23...
3. Place the bail (wire handle) in the unlocked position and align the transceiver with the port. 4. Slide the transceiver into the port and use gentle pressure to secure it in place. An audible click can be heard when the transceiver is secured in the port. S9501-28SMT Hardware Installation Guide | 24...
The equipment and its modules should only be repaired, maintained or replaced by skilled personnel. Instructed person is a term applied to persons who have been instructed and trained by a skilled person, or who is supervised by a skilled person. <電源コードセットに関する使用上の注意事項> 付属の「AC電源コードセット」は、本製品専用のものです。他の電気機器には絶 対に使用しないでください。 S9501-28SMT Hardware Installation Guide | 25...