Summary of Contents for UfiSpace S9610-36D

  • Page 1 S9610-36D Open Aggregation Router Hardware Installation Guide R1.1...
  • Page 2: Table Of Contents

    Connecting the USB Extender Cable ..................26 Connecting the 1PPS Interface ....................26 Connecting the 10MHz Interface ................... 27 Connecting the Transceiver ....................27 13 Cautions and Regulatory Compliance Statements .............. 28 Cautions and Regulatory Compliances .................. 28 S9610-36D Hardware Installation Guide | i...
  • Page 3: Overview

    Overview The UfiSpace S9610-36D is a 36 x 400G disaggregated open router that evolves the network to a 400G network, which enables next generation of 5G services and applications. The S9610-36D can be deployed at the provider edge network to enable transport services over a scalable next generation telecom network.
  • Page 4: Preparation

    PC with terminal emulation software. Refer to the "Initial System Setup" section for details. • Baud rate: 115200 bps • Data bits: 8 • Parity: None • Stop bits: 1 • Flow control: None S9610-36D Hardware Installation Guide | 2...
  • Page 5: Installation Environment Requirements

    1.19 inches (3cm). Therefore, to accommodate the fan and power supply handles, a minimum space clearance of 6 inches (15.2cm) is needed at the back of the S9610-36D. A total minimum reserve depth of 36 inches (91.4cm) is required. Figure 1.
  • Page 6: Preparation Check List

    S9610-36D requires 2RU (3.45”/8.8cm) in height, 19” (48.3cm) in width, and need a minimum reserve depth of 36 inches (91.4cm) Thermal requirements S9610-36D working temperature is 0 to 45°C (32°F to 113°F), airflow direction is front-to-back Installation tools required #2 Philips Screwdriver, 6-AWG yellow-and-green wire stripper, and...
  • Page 7: Package Contents

    2 x Screw M4.0*L5.5 0.004lb (1.9g)/1 set Mount Bracket) Power Cord 1.54lb (700g)/ 2 pcs 2 pcs 72.05” (1830mm) (AC Only) 0.77lb (350g)/1 pcs USB 3.0 Cable 1 pcs 7.87” (200mm) 0.03lb (13.6g)/ 1 pcs S9610-36D Hardware Installation Guide | 5...
  • Page 8: Component Physical Information

    0.7lb (318g) USB 3.0 cable 0.03lb (13.6g) 17.16” x 30” x 3.45” S9610-36D (W x D x H) (436 x 762 x 87.7mm) Dimension PSU (W x D x H) 2.68” x 18.06” x 1.60” (68 x 458.8 x 40.6mm) Fan (W x D x H) 3.19”...
  • Page 9: Identifying Your System

    Identifying Your System S9610-36D Overview Figure 4. PSU Overview Power supply unit (PSU) with 1+1 Redundancy. Hot swappable, field replaceable unit (FRU). AC Version: Figure 5. S9610-36D Hardware Installation Guide | 7...
  • Page 10: Fan Overview

    DC Version: Figure 6. Fan Overview 3+1 Redundant, hot swappable, field replaceable unit (FRU). Figure 7. S9610-36D Hardware Installation Guide | 8...
  • Page 11: Port Overview

    Up to 372.82mi (600km) 40/100/400G The S9610-36D ports 0-35 (labelled in blue in figure below) will all function normally when statistics counter is not enabled. Once the statistics counter is enabled, the service ports 1, 17, 19 and 35 (labelled in yellow in figure below) will be disabled and reserved for statistics functionality.
  • Page 12: Rack Mounting

    Make sure the locking screw of the inner rail is positioned at the front of the chassis. 2.2 After the attachment pins are secured to the inner rail, lock the inner rail to the chassis using two M4 screws (one on each chassis side). S9610-36D Hardware Installation Guide | 10...
  • Page 13 4.4 Push the blue release tab on each rail to unlock the rails and slide the chassis all the way into the rack. 4.5 Lock the chassis into place by using the screw on the front of the inner rail. S9610-36D Hardware Installation Guide | 11...
  • Page 14 Figure 13. S9610-36D Hardware Installation Guide | 12...
  • Page 15: Installing Fan Modules

    5. An audible click will be heard when the fan module is installed correctly. The fan module will not go in all the way if it is installed in the wrong direction. Figure 16. S9610-36D Hardware Installation Guide | 13...
  • Page 16: Installing Power Supply Units

    4. Carefully slide the new PSU into the power bay and gently push until it is flush with the case. 5. An audible click will be heard when the PSU is installed correctly. The PSU will not go in all the S9610-36D Hardware Installation Guide | 14...
  • Page 17 Figure 19. S9610-36D Hardware Installation Guide | 15...
  • Page 18: Grounding The Router

    4. Using a crimping tool, firmly secure the grounding wire to the grounding lug. Figure 20. 5. Locate the designated location for securing the grounding lug, which is located on the rear of the router and remove the protective label. S9610-36D Hardware Installation Guide | 16...
  • Page 19 Figure 21. 6. Using 2 M4 screws and 4 washers (provided with the package contents), firmly lock the grounding lug to the designated grounding location on the router. Figure 22. S9610-36D Hardware Installation Guide | 17...
  • Page 20: Connecting Power

    Also, please ensure that both PSUs have been properly installed before powering up the equipment, as the S9610-36D is designed to support 1 + 1 power redundancy. 2. Attach the DC power cables to the lugs.
  • Page 21 Locate the DC power screw-type terminal block located on the PSU. Remove the plastic cover that is protecting the terminal block by removing the single screw locking it in place. Secure the two-hole lugs (with the DC power cable attached) to the terminal block. S9610-36D Hardware Installation Guide | 19...
  • Page 22: Ac Version

    The maximum system power consumption is 1811 watts. It is recommended to ensure that enough power is reserved from the power distribution system before installation. Also, please ensure that both PSUs have been properly installed before powering up the equipment, as the S9610-36D Hardware Installation Guide | 20...
  • Page 23 S9610-36D is designed to support 1 + 1 power redundancy. 2. Attach the power cable. Locate the AC inlet connector on the PSU and plug the AC power cable (250VAC 15A, IEC60320 C19) into the AC inlet connector. 3. Feed AC power into the system.
  • Page 24: Verifying System Operation

    No Power Solid Green PSU1 is working normal Solid Amber PSU 1 fail (PSU1 need service) PSU FRU LED Additional information about PSU status can be obtained by the LEDs located on the PSU itself. S9610-36D Hardware Installation Guide | 22...
  • Page 25: Fan Fru Led

    Additional information about fan status can be obtained by the LEDs located on the fan itself. LED Condition Equipment Status No input power Green Fan FRU function normal Amber Fan FRU abnormal, service is required S9610-36D Hardware Installation Guide | 23...
  • Page 26: Initial System Setup

    USB cable provided in the packaging contents. Download the suitable driver for your operating system (OS) using the URL below: • https://www.silabs.com/products/development-tools/software/usb-to-uart-bridge- vcp-drivers • https://www.silabs.com/ and search for CP210X Figure 30. S9610-36D Hardware Installation Guide | 24...
  • Page 27 After the connection is established, a prompt for the username and password displays. Enter the username and password to access the CLI. The username and password should be provided by the Network Operating System (NOS) vendor. S9610-36D Hardware Installation Guide | 25...
  • Page 28: Cable Connections

    This USB port is a maintenance port. Figure 31. Connecting the 1PPS Interface Connect an external 1PPS cable with an impedance of 50 ohms to the port labelled “ 1PPS”. Figure 32. S9610-36D Hardware Installation Guide | 26...
  • Page 29: Connecting The 10Mhz Interface

    3. Place the bail (wire handle) in the unlocked position and align the transceiver with the port. 4. Slide the transceiver into the port and gently push until it is secured in place. An audible click can be heard when the transceiver is secured in the port. S9610-36D Hardware Installation Guide | 27...
  • Page 30: Cautions And Regulatory Compliance Statements

    This equipment must be grounded. Do not defeat the ground conductor or operate the equipment without correctly grounding the equipment. If there is any uncertainty about the integrity of the equipment's grounding, please contact the electrical inspection authority or a certified electrician. S9610-36D Hardware Installation Guide | 28...
  • Page 31 This is a Class A product based on the standard of the Voluntary Control Council for Interference by Information Technology Equipment (VCCI). If this equipment is used in a domestic environment, radio disturbance may arise. When such trouble occurs, the user may be required to take corrective actions. S9610-36D Hardware Installation Guide | 29...
  • Page 32 Only afforded by the use of a tool or lock and key, or other means of security, and controlled by the authority responsible for the location. Suitable for installation in Information Technology Rooms in accordance with Article 645 of the National Electrical Code and NFPA 75. S9610-36D Hardware Installation Guide | 30...