Overview The UfiSpace S9610-36D is a 36 x 400G disaggregated open router that evolves the network to a 400G network, which enables next generation of 5G services and applications. The S9610-36D can be deployed at the provider edge network to enable transport services over a scalable next generation telecom network.
1.19 inches (3cm). Therefore, to accommodate the fan and power supply handles, a minimum space clearance of 6 inches (15.2cm) is needed at the back of the S9610-36D. A total minimum reserve depth of 36 inches (91.4cm) is required. Figure 1.
S9610-36D requires 2RU (3.45”/8.8cm) in height, 19” (48.3cm) in width, and need a minimum reserve depth of 36 inches (91.4cm) Thermal requirements S9610-36D working temperature is 0 to 45°C (32°F to 113°F), airflow direction is front-to-back Installation tools required #2 Philips Screwdriver, 6-AWG yellow-and-green wire stripper, and...
0.7lb (318g) USB 3.0 cable 0.03lb (13.6g) 17.16” x 30” x 3.45” S9610-36D (W x D x H) (436 x 762 x 87.7mm) Dimension PSU (W x D x H) 2.68” x 18.06” x 1.60” (68 x 458.8 x 40.6mm) Fan (W x D x H) 3.19”...
Identifying Your System S9610-36D Overview Figure 4. PSU Overview Power supply unit (PSU) with 1+1 Redundancy. Hot swappable, field replaceable unit (FRU). AC Version: Figure 5. S9610-36D Hardware Installation Guide | 7...
Up to 372.82mi (600km) 40/100/400G The S9610-36D ports 0-35 (labelled in blue in figure below) will all function normally when statistics counter is not enabled. Once the statistics counter is enabled, the service ports 1, 17, 19 and 35 (labelled in yellow in figure below) will be disabled and reserved for statistics functionality.
Make sure the locking screw of the inner rail is positioned at the front of the chassis. 2.2 After the attachment pins are secured to the inner rail, lock the inner rail to the chassis using two M4 screws (one on each chassis side). S9610-36D Hardware Installation Guide | 10...
Page 13
4.4 Push the blue release tab on each rail to unlock the rails and slide the chassis all the way into the rack. 4.5 Lock the chassis into place by using the screw on the front of the inner rail. S9610-36D Hardware Installation Guide | 11...
5. An audible click will be heard when the fan module is installed correctly. The fan module will not go in all the way if it is installed in the wrong direction. Figure 16. S9610-36D Hardware Installation Guide | 13...
4. Carefully slide the new PSU into the power bay and gently push until it is flush with the case. 5. An audible click will be heard when the PSU is installed correctly. The PSU will not go in all the S9610-36D Hardware Installation Guide | 14...
4. Using a crimping tool, firmly secure the grounding wire to the grounding lug. Figure 20. 5. Locate the designated location for securing the grounding lug, which is located on the rear of the router and remove the protective label. S9610-36D Hardware Installation Guide | 16...
Page 19
Figure 21. 6. Using 2 M4 screws and 4 washers (provided with the package contents), firmly lock the grounding lug to the designated grounding location on the router. Figure 22. S9610-36D Hardware Installation Guide | 17...
Also, please ensure that both PSUs have been properly installed before powering up the equipment, as the S9610-36D is designed to support 1 + 1 power redundancy. 2. Attach the DC power cables to the lugs.
Page 21
Locate the DC power screw-type terminal block located on the PSU. Remove the plastic cover that is protecting the terminal block by removing the single screw locking it in place. Secure the two-hole lugs (with the DC power cable attached) to the terminal block. S9610-36D Hardware Installation Guide | 19...
The maximum system power consumption is 1811 watts. It is recommended to ensure that enough power is reserved from the power distribution system before installation. Also, please ensure that both PSUs have been properly installed before powering up the equipment, as the S9610-36D Hardware Installation Guide | 20...
Page 23
S9610-36D is designed to support 1 + 1 power redundancy. 2. Attach the power cable. Locate the AC inlet connector on the PSU and plug the AC power cable (250VAC 15A, IEC60320 C19) into the AC inlet connector. 3. Feed AC power into the system.
No Power Solid Green PSU1 is working normal Solid Amber PSU 1 fail (PSU1 need service) PSU FRU LED Additional information about PSU status can be obtained by the LEDs located on the PSU itself. S9610-36D Hardware Installation Guide | 22...
Additional information about fan status can be obtained by the LEDs located on the fan itself. LED Condition Equipment Status No input power Green Fan FRU function normal Amber Fan FRU abnormal, service is required S9610-36D Hardware Installation Guide | 23...
USB cable provided in the packaging contents. Download the suitable driver for your operating system (OS) using the URL below: • https://www.silabs.com/products/development-tools/software/usb-to-uart-bridge- vcp-drivers • https://www.silabs.com/ and search for CP210X Figure 30. S9610-36D Hardware Installation Guide | 24...
Page 27
After the connection is established, a prompt for the username and password displays. Enter the username and password to access the CLI. The username and password should be provided by the Network Operating System (NOS) vendor. S9610-36D Hardware Installation Guide | 25...
This USB port is a maintenance port. Figure 31. Connecting the 1PPS Interface Connect an external 1PPS cable with an impedance of 50 ohms to the port labelled “ 1PPS”. Figure 32. S9610-36D Hardware Installation Guide | 26...
3. Place the bail (wire handle) in the unlocked position and align the transceiver with the port. 4. Slide the transceiver into the port and gently push until it is secured in place. An audible click can be heard when the transceiver is secured in the port. S9610-36D Hardware Installation Guide | 27...
This equipment must be grounded. Do not defeat the ground conductor or operate the equipment without correctly grounding the equipment. If there is any uncertainty about the integrity of the equipment's grounding, please contact the electrical inspection authority or a certified electrician. S9610-36D Hardware Installation Guide | 28...
Page 31
This is a Class A product based on the standard of the Voluntary Control Council for Interference by Information Technology Equipment (VCCI). If this equipment is used in a domestic environment, radio disturbance may arise. When such trouble occurs, the user may be required to take corrective actions. S9610-36D Hardware Installation Guide | 29...
Page 32
Only afforded by the use of a tool or lock and key, or other means of security, and controlled by the authority responsible for the location. Suitable for installation in Information Technology Rooms in accordance with Article 645 of the National Electrical Code and NFPA 75. S9610-36D Hardware Installation Guide | 30...
Need help?
Do you have a question about the S9610-36D and is the answer not in the manual?
Questions and answers