1
OUT 0
2
OUT 1
3
OUT 2
4
OUT 3
5
OUT 4
6
OUT 5
7
OUT 6
8
OUT 7
9
NC
10
EARTH
11
OUT 8
12
OUT 9
13
OUT 10
14
OUT 11
15
OUT 12
16
OUT 13
17
OUT 14
18
OUT 15
19
E+24V
20
EGND
Terminal Wiring
(Please use tubular pre-insulated terminals and wire cable that is suitable to wire path
to do user terminal wiring)
→Cable production steps:
➢ Strip the cable insulation, the exposed copper part depends on the size of the tube-
type pre-insulated terminal.
➢ Pass the conductor part of the cable into the tubular pre-insulated terminal and
crimp it with a crimping pliers.
Output
Output
Output
Output
Output
Output
Output
Output
-
-
Output
Output
Output
Output
Output
Output
Output
Output
Power positive pole
Power negative pole
29
ZMIO300 Series Hardware Manual Version 1.8
Switch output 0
Switch output 1
Switch output 2
Switch output 3
Switch output 4
Switch output 5
Switch output 6
Switch output 7
Reserved
Shield
Switch output 8
Switch output 9
Switch output 10
Switch output 11
Switch output 12
Switch output 13
Switch output 14
Switch output 15
24V power output positive pole
24V power output negative pole