5.10. Installation Study

In order to ensure correct operation of the CANlink mobile hardware when it is installed on the machine under real
setup and environmental conditions, Proemion recommends performing an installation study..
The installation study ideally consists of two phases:
# Phase
Description
1
Verificatio
In the initial phase of the installation study, it is essential to verify the setup requirements in regards to
n
the specification of the CANlink mobile.
2
Validation
During the validation phase, the device is tested under real operating conditions and its suitability for
the planned application is assessed. Several iterations and corrective actions may be required at this
stage.