Connecting The Power Supply - Siemens 7MJ2000-1A 00 Series Operating Instructions Manual

Process monitoring for oscillating positive displacement pumps
Table of Contents

Advertisement

Connecting

5.8 Connecting the power supply

5.8
Connecting the power supply
Procedure
The procedure for connecting the power supply is as follows:
1. Pass the connecting leads L+, L- and the earth cable through the cable gland ⑦.
2. Connect L+ to terminal 11 and L- to terminal 12.
3. Connect the earth cable to the earthing clamp on the mounting plate.
Note
Electromagnetic Compatibility
To guarantee high EMC interference immunity, the earth cable should be kept as short as
possible.
In addition, a compensating line with as large a cross-section as possible is strongly
recommended between the sensors and the earthing point.
See also
Cable gland (Page 29)
Terminal assignment (Page 28)
34
SITRANS DA400 for oscillating positive displacement pumps
Operating Instructions, 09/2008, A5E00841120-03

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sitrans da4007mj2400-1aa01

Table of Contents