Operation; Preparing The Device; Starting Operation - Thermo Scientific BB 150 User Manual

Co2 incubator
Table of Contents

Advertisement

7.

Operation

7.1

Preparing the device

The device must only be released for operation after all major measures for the
start-up have been taken (Section 5.1–5.7).
Prior to starting operation, the following device components must be checked
for their correct function:
Gas hoses must be seated tight on the connecting filter and must be secu-
red using a hose clamp.
The access port must be capped.
The pressure compensation opening must be permeable, its insert must be
installed in the work space.
The glass door seal must not be damaged.
The glass door measurement opening must be capped.
The shelf system components must be installed safely.
NOTE – Hygiene regulations
Prior to any operation, the user must clean and
disinfect the work space in accordance with
the hygiene regulations set forth by the ope-
rator to protect the cultures.
The "Principles of good microbiological
practice" at the end of these instructions are
to be used as safety information for personnel
operating the device.
NOTE – Water supply
The water tray of the work space can hold up
to 3.0 l of processed water. When running the
operation, always keep a sufficient quantity of
processed water of the following quality
available:
Water quality recommendation:
For trouble-free operation of the equipment,
fill the water reservoir with sterilized destilled
water
conductivity should be within the range of 1 to
20 μS (resistivity within the range of 50 kΩ Ω Ω Ω Ω
to 1 MΩ Ω Ω Ω Ω ).
or
equivalent.
The
acceptable
CO
Incubator BB 150 Operating Instructions
2
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bb 15Rb 150Bb 24Rb 240

Table of Contents