Nortel Meridian SuperNode SL-100 Reference Manual page 42

Intelligent peripheral equipment (ipe)
Hide thumbs Also See for Meridian SuperNode SL-100:
Table of Contents

Advertisement

3-2 Provisioning an IPEC
The following table lists the required equipment for an IPE module.
Table 2 Required equipment for an IPE module
Qty
1
2
The following table lists the provisionable equipment for an IPE module and
the line cards used.
Table 3 Provisionable equipment for an IPE module (Sheet 1 of 2)
Qty
555-4001-129 Standard 08.01 Novenber 2000
PEC
Description
IPE module assembly:
NT7D07BA
enhanced controller card
or
controller card
NT7D07AC
PE power supply DC
NT6D40AB
IPE module DC
NT8D37EC
tip and ring cables (16)
NT8D81AA
NT8D92AB
controller to I/O cable
NTNX36DR
Cable that connects the MCTM, MCTM-I,
MCRM, MCRM-S, MNET, and MLNK to the
IPE.
Note: MCTM, MCRM, MNET, and MLNK
have been manufacture discontinued but are
still supported in the field.
PEC
Description
NT8D02
DLC-16 port IVD Digital Line Card
NT8D03
16 port analog line card
NT8D09
MLC-16 port analog (500/2500) with Message
Waiting feature
NT5D11
LTI-24 port analog T-1 interface card
Note: Occupies 2 consecutive slots-cannot
be installed in slot 7 or 15
NT5D51
Meridian Integrated Conference Bridge
(MICBII)
NTQR02AA
Meridian HomeOffice II (MHOII Release 2)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian sl-100

Table of Contents