Removing And Installing High-Pressure Pipe - Audi A8 2010 Workshop Manual

Hide thumbs Also See for A8 2010:
Table of Contents

Advertisement

Simos direct petrol injection and ignition system (6-cyl. 3.0 ltr. TFSI 4-valve) - Edition 12.2011
❑ Do not alter shape
❑ Check for damage before re-installing
❑ Lubricate thread of union nut with fuel
❑ 25 Nm
8 - Gasket
❑ Renew
9 - Housing
10 - Hall sender -G40-
❑ Removing and installing
11 - Bolt
❑ 9 Nm
12 - O-ring
❑ Renew
13 - Protective plate
❑ For high-pressure pipe
14 - Nut
❑ 9 Nm
15 - Threaded pin
❑ 9 Nm
16 - Roller tappet
❑ Can only be installed in one position
❑ Lubricate lightly with clean engine oil before installing
17 - O-ring
❑ Renew
❑ Lubricate lightly with clean engine oil before installing
High-pressure pump - tightening torque and sequence
– Tighten bolts in 2 stages as follows:
Stage
Bolts
1.
-arrows-
2.
-arrows-
2.15
Removing and installing high-pressure
pipe
Protected by copyright. Copying for private or commercial purposes, in part or in whole, is not
Special tools and workshop equipment required
permitted unless authorised by AUDI AG. AUDI AG does not guarantee or accept any liability
with respect to the correctness of information in this document. Copyright by AUDI AG.
⇒ page 55
Tightening torque
Screw in bolts by hand until they make
contact
Tighten in stages; final torque 20 Nm
Audi A8 2010 ➤
37
2. Injection system

Advertisement

Table of Contents
loading

Table of Contents