Scheduler; Holiday Editor; Add A New Holiday; Standard Holiday List - Leviton EZ-MAX User Manual

Relay products
Hide thumbs Also See for EZ-MAX:
Table of Contents

Advertisement

Scheduler

The Scheduler allows preprogramming of events to occur automatically on some sort
of schedule. The specific thing that occurs is an "Action" and must be created in the
action editor. The schedule that the action occurs on is defined in the scheduler.
There are six submenus that can be selected from the Scheduler Menu screen.
• ADD A NEW EVENT
• EDIT AN EVENT
• DELETE AN EVENT

• HOLIDAY EDITOR

• IS NOW STOPPED
When setting up an event, follow these general rules:
Holiday Editor
Holiday's are events that occur on a specific day of year as opposed to those events
which recur on a weekly schedule. In order for holidays to be used, two things must
happen: 1. they must be created, and 2. the holiday must be assigned to a holiday
list.
From the holiday editor, there are four submenus:
• ADD NEW HOLIDAY
• EDIT A HOLIDAY
• DELETE A HOLIDAY
• EXIT (DONE)

Add a New Holiday

Holidays can be either selected from a standard list of holidays or by entering the
custom holiday editor.

Standard Holiday List

Many common North American Holidays are found on this list:
• New Years Eve
Z-Max Advanced Programming & Systems Design Guide
Revision A:11/2005
Create your Actions
Step 1:
Create your Holidays
Step 2:
Create your Event
Step 3:
Once a holiday is assigned to a holiday list, that
day is "removed" from the normal weekly
schedule and added into the holiday schedule.
That means that in order for an event to occur on
that day, the holiday list MUST be enabled for the
event.

Scheduler

rac00-sdg
Page 91

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z-max remote

Table of Contents