Operation setup
Heat
Tank
29
Service setup
30
31
20
Water temp. for heating ON
21
Outdoor temp. for heating OFF
22
∆T for heating ON
23
Heater ON/OFF
24
Floor operation time (max.)
25
Tank heat up time (max.)
26
Tank re-heat temp.
27
28
Force DHW Temp.
Pump maximum speed
Dry concrete
Service contact
Sterilization
Pump maximum speed setup
ON (Dry concrete)
Edit (Dry concrete schedule)
Contact 1
Name and Tel No. setup
Contact 2
Name and Tel No. setup
86
Compensation curve
Direct
Heating OFF Temp. setup
∆T for heating setup
O/D temp for heater ON setup
Heater ON Delay Time
∆T of target temperature for Heater ON
∆T of target temperature for Heater OFF
Max. operation time for Heat & Cool mode setup
Max. operation time for Tank mode setup
Tank re-heat temp. setup
Sterilization day and temp. and time setup
Force DHW temp. setup
Air purge
Day and temp. setup
Compensation
curve setup
Direct temp. setup