Index R200 Operating Instructions And Maintenance Instructions page 94

Hide thumbs Also See for R200:
Table of Contents

Advertisement

88
7.
Example: Remove bar stop
Remove bar stop (3).
8.
Example: Measure the installation size of the stopper unit
Measure the installation size of the stopper unit (1) and the guide ring (2) and
record the values.
9.
Example: Stopper unit D42
Remove cooling lubricant and stopper unit. Loosen screws (6) and pull the
cooling lubricant and stopper unit (1) out of the spindle from the back. The
guide ring (2) has an O-ring (5) at its outside with which the spindle is sealed
towards the work area and a Glyd® ring (4) inside that is used to guide the
cooling lubricant and stopper unit in the spindle.
Maintenance Summary - 4.000 Operating hours
Maintenance Instructions
R200
LR1702.10181 - 05.06.2019

Advertisement

Table of Contents
loading

This manual is also suitable for:

C100C200R300

Table of Contents