3 For the Installer
Delivery and handling
TRANSPORT
VPB S/ VPBS S should be transported and stored vertic-
ally in a dry place. The VPB S/ VPBS S may, however,
be carefully laid on its back when being moved into a
building.
ASSEMBLY
The water heater is only designed for upright installation.
The water heater's installation area should always
maintain a temperature of at least 10 °C (frost-free) and
be provided with a floor drain.
Position VPB S/ VPBS S on a firm base that can take the
weight, preferably on a concrete floor or foundation.
Use the product's adjustable feet to obtain a horizontal
and stable set-up.
20-55 mm
30 - 50 mm
SUPPLIED COMPONENTS
VPB S/ VPBS S Enamel
1 x Potentiostat
8
Chapter 3 | For the Installer
0
R
0
R
REMOVING THE COVERS
Front cover
Disconnect the front cover at the top edge and pull
1.
it straight out.
2.
Lift the front cover upwards.
Side panels
1.
Remove the screws from the upper and lower
edges.
2.
Twist the cover slightly outward.
Move the hatch backwards and slightly to the side.
3.
Pull the cover to one side.
4.
Pull the hatch forwards.
5.
H M flo w 4 9 (5 0 )
H o t w a te r 5 1 °C
°C
+ 2
0
-2
0
1
R
H M flo w 4 9 (5 0 )
H o t w a te r 5 1 °C
°C
+ 2
0
-2
R
1
0
NIBE VPB S/ VPBS S