2 Delivery and handling

Transport

However. the VPB/VPBS may be carefully laid on its
back when being moved into a building. The centre of
gravity is in the upper part.
VPB/VPBS should be transported and stored vertically
in a dry place. However, the VPB/VPBS may be carefully
laid on its back when being moved into a building.

Assembly

The water heater is only designed for upright install-
ation.
Position VPB/VPBS on a firm base that can take the
weight, preferably on a concrete floor or foundation.
Use the water heater's adjustable feet to obtain a
horizontal and stable set-up.
30 - 50 mm
The area where VPB/VPBS is located must be
equipped with floor drainage.
The water heater's installation area should always
have a temperature of at least 10 °C and max 30 °C.

Supplied components

VPB/VPBS Enamel
VPB/VPBS
Location
The kit of supplied items is placed on top of the
product.
0
R
Potentiostat
Chapter 2 |
Delivery and handling
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vpbs seriesVpb 300Vpbs 300Vpb 200

Table of Contents