Delivery And Handling; Transport; Assembly; Supplied Components - Nibe VPD 300 Installer Manual

Hot water heater
Hide thumbs Also See for VPD 300:
Table of Contents

Advertisement

2 Delivery and handling

Transport

VPD should be transported and stored vertically in a
dry place. The VPD may, however, be carefully laid on
its back when being moved into a building.

Assembly

The water heater is only designed for upright install-
ation.
Position VPD on a firm base that can take the weight,
preferably on a concrete floor or foundation. Use the
heater's adjustable feet to obtain a horizontal and
stable set-up.
30 - 50 mm
The area where VPD is located must be equipped
with floor drainage.
The water heater installation area should always have
a temperature of at least 10 °C and max 30 °C.
VPD 150, 300

Supplied components

0
R
2 x 15/15 straight coup-
1 x non-return valve
2 x 22/15 reduction sleeves
Location
The kit of supplied items is placed on top of the
product.
2 x 22/15 straight coup-
lings
1 x 28/22/15 T-coupling
Chapter 2 |
Delivery and handling
lings
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vpd 150

Table of Contents